According to the reports, the elevation was denied by the aviation ministry due to height restrictions in areas near the airport.
19 Mar 2018 1:14 AM
Brace for traffic jams as construction work starts in June
19 Mar 2018 1:10 AM
MMRDA had floated bids for the 23.5km long DN Nagar-Mankhurd Metro-2B corridor and the 32km-long Wadala-Thane Metro-4 corridor.
14 Jun 2017 2:24 AM