Friday, Sep 18, 2020 | Last Update : 02:18 PM IST

178th Day Of Lockdown

Maharashtra114584081235431351 Andhra Pradesh6014625080885177 Tamil Nadu5142084589008618 Karnataka4943563830777629 Uttar Pradesh3362942632884771 Delhi2347011981034877 West Bengal2155801870614183 Odisha167161133466722 Telangana1650031335551005 Bihar164224149722855 Assam150349121610528 Kerala12221687341490 Gujarat119088999083271 Rajasthan109088906851293 Haryana103773816901069 Madhya Pradesh97906743981877 Punjab90032658182646 Chhatisgarh7777541111628 Jharkhand6710052807590 Jammu and Kashmir5971138521951 Uttarakhand3713924810460 Goa2678320844327 Puducherry2142816253431 Tripura2069612956222 Himachal Pradesh11190691997 Chandigarh92566062106 Manipur8430653951 Arunachal Pradesh6851496713 Nagaland5306407910 Meghalaya4356234232 Sikkim2119178923 Mizoram15069490
  Science   02 May 2019  India ready for mission to the Moon on July 9, 2019

India ready for mission to the Moon on July 9, 2019

DECCAN CHRONICLE
Published : May 2, 2019, 9:51 am IST
Updated : May 2, 2019, 9:51 am IST

The mission will make India the fourth country in the world to land a spacecraft on the Moon.

The Indian mission to the Moon would see a landing by the space shuttle in the southern pole since it is the part of the lunar surface that has not been explored by any other country as yet. The landing zone will also give ISRO an opportunity to name the area or site, putting India into the history of space exploration.
 The Indian mission to the Moon would see a landing by the space shuttle in the southern pole since it is the part of the lunar surface that has not been explored by any other country as yet. The landing zone will also give ISRO an opportunity to name the area or site, putting India into the history of space exploration.

The second Indian mission to the Moon is all set to be witnessed in July this year. ISRO is readying its Chandrayaan 2 in July 2019, which was earlier planned for April. The Indian space organisation has confirmed that all the modules required for the lunar landing will be in place in the next two months.

“All the modules are getting ready for the Chandrayaan-2 launch during the window of July 9 to July 16. The expected moon landing on September 6," said the space agency in a statement on Wednesday, reported the local media.

 

The space mission will be launched from the Satish Dhawan Space Centre in Sriharikota, Andhra Pradesh.

The Indian mission to the Moon would see a landing by the space shuttle in the southern pole since it is the part of the lunar surface that has not been explored by any other country as yet. The landing zone will also give ISRO an opportunity to name the area or site, putting India into the history of space exploration.

“We are ready for one of the most exciting missions, #Chandrayaan2. Launch window between July 9-16 & likely Moon-landing on Sept 6, 2019. #GSLVMKIII will carry 3 modules of this #lunarmission - Orbiter, Lander (Vikram), Rover (Pragyan),” said the twitter post from ISRO on May 1.

 

The launch that wsa supposed to be witnessed in April was postponed for further testing and reconfiguration of the lander. ISRO confirmed that the mission would have three modules, all built and developed in India, and will be named Orbiter, Vikram (the lander) and Pragyan (the rover).

The Orbiter and Lander will be stacked inside the Geosynchronous Satellite Launch Vehicle MK-III launch vehicle. After launch, the modules will orbit Earth and then the respective modules will reach the lunar orbit using the orbiter propulsion module. The lander will then separate itself from the orbiter to soft land at a pre-determined spot that will be closer to the south pole of the lunar surface. The Lander is destined to touch down on September 6, 2019.

 

Once landed, the rover will then take charge and carry out scientific experiments on the Moon’s surface itself. The rover, lander and orbiter will also be carrying out scientific experiments and all the data will be relayed back to the Earth station. The rover will roll out onto the lunar surface and journey for around 300 to 400 metres and spend around 14 days on the Moon carrying out necessary experiments. The data will be sent to Earth within 15 minutes of each test.

If India’s mission is successful, it would put India as the fourth country in the world after US, Russia and China to successfully land a craft on the Moon. Israel’s attempt for the same failed in April this year. China’s spacecraft was the only one to land on the other side of the Moon that has never seen the face of the Earth, ever.

 

The last mission from ISRO was the Chandrayaan 1 which was an orbiting satellite only, made more than 3,400 trips around the Moon and sent back hundreds of photographs of the Moon’s surface. The 2008 Chandrayaan 1 mission finally broke down after ISRO lost communication with the orbiting satellite in August 2009, which was half the period of the two-year mission. However, the mission that lasted 312 days had successfully completed 95% of it’s planned objectives.

Tags: moon, mission, lander, lunar, isro