Wednesday, Apr 17, 2024 | Last Update : 01:33 AM IST

  Business   Companies  15 Feb 2017  RIL awards MJ-1 deep-water front-end engg contract to Genesis

RIL awards MJ-1 deep-water front-end engg contract to Genesis

DECCAN CHRONICLE
Published : Feb 15, 2017, 4:53 pm IST
Updated : Feb 15, 2017, 4:53 pm IST

Reliance Industries is the operator of Block KG-DWN-98/3 of KG-D6 in Bay of Bengal with a 60 per cent interest.

 The work will be managed from the Genesis head office in London. (Representational image)
  The work will be managed from the Genesis head office in London. (Representational image)

New Delhi: Reliance Industries has selected engineering group Genesis to do a deep-water front-end engineering contract for its MJ-1 gas discovery in KG-D6 block.

Genesis, a subsidiary of newly merged TechnipFMC, will prepare engineering blueprint for producing gas and condensate through seven wells, tied up to a floating production, storage and offloading (FPSO), the company said in a statement. The work will be managed from the Genesis head office in London.

John Cambridge, Genesis' Managing Director, said: "This award is strategically important to Genesis and we are very excited to be awarded this contract by RIL."

Reliance Industries is the operator of Block KG-DWN-98/3 of KG-D6 in Bay of Bengal with a 60 per cent interest. BP Plc of UK owns a 30 per cent share while Canada's Niko Resources holds the remaining 10 per cent.

A resource evaluation report by Deloitte, which was based on data from the MJ-1 discovery well and the MJ-A1, MJ-A2 and MJ-A3 appraisal wells, found the MJ field contains best estimate gross contingent non-associated gas resources of 1.1 trillion cubic feet and condensate resources of 49 million barrels.

Located about 2,000 meters below the producing D1-D3 fields in the KG-D6 block, MJ-1 may be the third biggest gas field in the block. D1&D3 hold a revised 3.10 Tcf of reserves and R-Series field holds about 2 Tcf of recoverable reserves.

RIL has so far made 19 gas discoveries, of which D1&D3 were put on production in April 2009. MA oil and gas field was put on production in September 2008.  

Tags: reliance industries, genesis, kg-d6 block, engineering contract
Location: India, Delhi, New Delhi