The new FOB was likely to be constructed before the monsoon of 2019.
22 Nov 2018 1:29 AM
Team of 50 engineers were present on site.
19 Nov 2018 1:08 AM
The Patripul connects Kalyan east to Kalyan west for both vehicles and pedestrians crossing the tracks.
15 Nov 2018 1:30 AM
The Maharashtra State Road Development Corporation (MSRDC) will construct the bridge in 12 to 18 months once the bridge is dismantled.
22 Aug 2018 2:41 AM
The 100-year-old, British-made bridge needs urgent repairs as it is in shambles and full of potholes.
18 Aug 2018 2:07 AM