Friday, Mar 29, 2024 | Last Update : 07:09 AM IST

  Metros   Mumbai  22 Feb 2018  L&T bags contract for Metro-3 electrical works

L&T bags contract for Metro-3 electrical works

THE ASIAN AGE.
Published : Feb 22, 2018, 6:24 am IST
Updated : Feb 22, 2018, 6:24 am IST

Meanwhile, of the 17 TBMs (Tunnel Boring Machines) which are used for the tunnelling of the underground Metro.

The Mumbai Metro Rail Corporation's Metro III project is completely underground and will connect Colaba in South Mumbai to Bandra and Santacruz Electronics Export Processing Zone in the western suburbs of the city. (Photo: ANI)
 The Mumbai Metro Rail Corporation's Metro III project is completely underground and will connect Colaba in South Mumbai to Bandra and Santacruz Electronics Export Processing Zone in the western suburbs of the city. (Photo: ANI)

Mumbai: The Mumbai Metro Rail Corporation (MMRC), on Wednesday, awarded two key contracts for the electrical system works of 25 kV Traction and Power supply system for Colaba-Bandra-Seepz Metro III project after obtaining clearance from JICA as per procurement norms. MMRC designed the work in two packages to achieve faster execution.  

A traction substation or traction current converter plant is an electrical substation that converts electric power from the form provided by the electrical power industry for public utility service to an appropriate voltage. 25Kv is the universally accepted voltage standard for an Over Head Equipment (OHE).  “Traction & Power supply works” is a critical component of Metro 3 implementation. We aim to implement robust and technologically advanced Traction & power supply system for Metro Line III and complete the works in time so that Line III project can be completed within stipulated timelines,” said Ashwini Bhide, Managing Director (MD), MMRC.  

The works consists of setting up three Receiving substations, laying Overhead Rigid conductor system in Underground tunnel alignment of 33.5 km route length  and other considering works. M/s Larsen & Toubro Limited’ has been awarded the work. 

Meanwhile, of the 17 TBMs (Tunnel Boring Machines) which are used for the tunnelling of the underground Metro, five have been commissioned and two machines are lowered down. 

Tunnelling of twin tunnels at Nayanagar site, Mahim has reached 122 and 128 meters respectively while the one at Azad Maidan has finished 100 meters.

Tags: mumbai metro rail corporation, managing director, tunnel boring machines